Epsilon Innovation Group

Climate Risk & Adaptation Screening Checklists

Practical screening toolkit for projects, programs, assets, and services

0/17 answered · Avg –Results

About This Toolkit

Assessment Details

Project / program / asset / service
Organization / implementing entity
Location(s) / geographic scope
Sector / subsector
Project life / planning horizon
Assessor(s) / role(s)
Date / version

Purpose and Scope

You can use this toolkit at the concept, planning, design, or review stage to determine whether climate-related hazards might affect a project, program, asset, service, people, or intended results and to record appropriate adaptation actions. The toolkit is intended for public agencies, project teams, utilities, businesses, and development partners.

It is only a preliminary screening tool and should not be regarded as a thorough climate-risk and vulnerability assessment, engineering design, safeguard assessment, or certification. The purpose of screening is to identify matters that may require further investigation, not to prove a project is safe or climate-resilient.

Important: The checklist below evaluates the completeness of the screening and response process, not the seriousness of the climate risk. Record the risk individually in the risk register. A low process score does not imply low climate risk.

How to Use the Toolkit

  • Set the project boundaries, identify locations, specify components, determine intended outcomes, and define operating life.
  • Complete Checklist 1 to identify screening triggers and information gaps.
  • Complete Checklist 2 to note relevant climate hazards and time horizons. Use the best available local and authoritative climate information and record source, date, and limitations.
  • Complete Checklist 3 by selecting one process-readiness response for each question. Mark N/A only when truly not relevant and explain why.
  • Record key risks in Checklist 4, including who or what is exposed, potential consequences, uncertainty, and existing controls.
  • Complete Checklist 5 to assign adaptation actions, owners, timing, resources, and monitoring.
  • Escalate for specialist assessment when screening indicates significant, uncertain, long-lived, or potentially irreversible risk.

Checklist 1 — Initial Screening Triggers

For each prompt, tick Yes, No, or Unknown. Add a brief note or evidence source. A “Yes” or “Unknown” is a prompt for further consideration—not by itself a final risk rating.

1.Does the project include physical assets, infrastructure, land use, or operations that will remain in place for several years or longer?

2.Is any project location potentially exposed to extreme heat, heavy rainfall or flooding, drought, wildfire, storms, coastal hazards, landslide, or another climate-related hazard?

3.Does the project depend on climate-sensitive water, ecosystems, agriculture, energy, transport, labor, or supply chains?

4.Could climate impacts disrupt a critical public service, essential infrastructure, health or safety, livelihoods, or project outcomes?

5.Are communities or groups who may face greater exposure or have fewer resources to prepare and recover among the project’s workers, users, or neighbors?

6.Have past climate or weather events caused damage, service disruption, losses, or near misses in or near the project area?

7.Could the project increase exposure or vulnerability elsewhere, transfer risk downstream, damage natural buffers, or lock in future development in a hazard-prone area?

8.Are climate data, future conditions, asset condition, or potential consequences uncertain or unavailable?

Initial screening outcome

Checklist 2 — Climate Hazard and Time-Horizon Inventory

Tick hazards that are relevant or need checking. Relevance depends on location, sector, design, operating life, and project context. This list is illustrative, not exhaustive. Do not assume a hazard is absent just because local records are limited.

Extreme heat / heatwaves / warm nights

Extreme cold / frost / changing snow or ice conditions

Heavy rainfall / flash or pluvial flooding

River / lake flooding

Coastal flooding / storm surge / sea-level rise

Drought / prolonged dry spells / water scarcity

Changing seasonal rainfall / rainfall variability

Strong winds / tropical cyclones / severe storms / lightning

Wildfire / smoke / vegetation fire

Landslide / erosion / slope instability / debris flow

Coastal erosion / saltwater intrusion / salinity

Ecosystem, biodiversity, or disease-vector shifts

Other locally relevant hazard or climate stressor

Time Horizons and Climate Information

Consider time horizons matching the project’s construction, operating life, maintenance cycle, and decisions. Adapt these periods if local planning standards require different horizons.

Checklist 3 — Climate Risk & Adaptation Process Screening

Process-Readiness Scale

1
Not assessedNo systematic information or assessment is available.
2
InitialThe issue has been noted, but evidence or analysis is limited.
3
Partly assessedRelevant evidence and actions exist, but important gaps remain.
4
Assessed and integratedEvidence is documented, decisions reflect it, and actions are assigned and tracked.
–
Not applicableExplain why the item does not apply to the defined scope.

For each question, select the response that best describes the current screening process. Record the score and a short example. The questions cover scope, climate evidence, risk pathways, adaptation choices, safeguards, and delivery.

A. Scope and Climate Evidence

Project scope, location, and useful life

1. Project scope, location, and useful life

Have the project boundary, components, locations, intended outcomes, operating life, and important decision points been defined for climate screening?

Historical climate and disaster experience

2. Historical climate and disaster experience

Have observed climate conditions, local records, past events, damage, service disruptions, and community knowledge been reviewed?

Future climate conditions and uncertainty

3. Future climate conditions and uncertainty

Have future climate conditions been considered over time horizons relevant to the project, using appropriate sources and acknowledging uncertainty?

Hazard identification and climate information quality

4. Hazard identification and climate information quality

Have relevant acute and chronic hazards been identified using suitable local, sectoral, and authoritative information?

B. Exposure, Vulnerability, and Consequences

Exposure of assets, people, services, and dependencies

5. Exposure of assets, people, services, and dependencies

Have potentially exposed assets, workers, users, communities, natural resources, supply chains, and essential services been identified and mapped where feasible?

Sensitivity, criticality, and thresholds

6. Sensitivity, criticality, and thresholds

Has the assessment considered how exposed components may be affected, including design limits, operating thresholds, downtime, and consequences for project outcomes?

Vulnerability and adaptive capacity

7. Vulnerability and adaptive capacity

Have existing vulnerabilities and capacities to prepare, respond, recover, and adapt been considered for people, institutions, assets, and ecosystems?

Compound, cascading, and interdependent risks

8. Compound, cascading, and interdependent risks

Have combined hazards and knock-on impacts across connected infrastructure, sectors, supply chains, services, and communities been considered?

Risk significance, uncertainty, and decision thresholds

9. Risk significance, uncertainty, and decision thresholds

Have risks been prioritized using transparent consideration of likelihood, consequence, time horizon, confidence, and the project’s risk tolerance?

C. Adaptation Options, Safeguards, and Residual Risk

Identification of adaptation options

10. Identification of adaptation options

Have suitable adaptation options been identified for priority risks, including operational, structural, nature-based, planning, service, and preparedness measures where relevant?

Comparison, feasibility, and flexibility of options

11. Comparison, feasibility, and flexibility of options

Have options been compared for effectiveness over the project life, technical and institutional feasibility, cost, flexibility, and performance under uncertainty?

Maladaptation, trade-offs, and unintended consequences

12. Maladaptation, trade-offs, and unintended consequences

Have proposed actions been checked for the possibility of transferring risk, increasing emissions, harming ecosystems, worsening inequity, or locking in future vulnerability?

Stakeholder participation and inclusion

13. Stakeholder participation and inclusion

Have affected people and relevant stakeholders—including groups facing greater climate risk—been engaged in identifying risks and shaping adaptation choices?

Environmental and social safeguards

14. Environmental and social safeguards

Are adaptation actions screened for effects on land, water, biodiversity, livelihoods, cultural heritage, health, safety, and rights, with mitigation where needed?

Residual risk and contingency planning

15. Residual risk and contingency planning

After existing and proposed measures, have remaining risks, emergency arrangements, and limits to adaptation been documented?

D. Implementation and Learning

Integration into project design and operations

16. Integration into project design and operations

Are climate risks and adaptation measures reflected in design criteria, siting, procurement, construction, operations, maintenance, and service continuity plans as relevant?

Governance, resources, monitoring, and review

17. Governance, resources, monitoring, and review

Are adaptation actions assigned owners, resources, measurable indicators, review dates, and triggers for updating the assessment?

Checklist 4 — Climate Risk Register

Use one row for each material risk pathway. Add rows as needed. Record the hazard and the exposed element together with the potential consequence; do not list a hazard alone as a complete risk statement.

Risk pathway: hazard → exposed element → consequenceLocation / group / serviceTime horizonLikelihood / confidenceConsequence / severityInitial risk levelExisting controls / evidenceFurther assessment or action needed

Important: Use the organization’s approved risk criteria where available. If there is no approved method, explain how ratings were assigned. Record uncertainty explicitly; do not treat missing data as evidence of low risk.

Checklist 5 — Adaptation Action and Follow-Up Plan

Priority risk / findingSelected adaptation or further-study actionOwner / partnerTarget date / stageBudget / resource needIndicator, trigger, or evidence of completionStatus

Prioritization Prompts

Before confirming an action, check whether it:

  • Addresses a clearly described climate risk pathway and protects the project’s intended outcomes.
  • Is proportionate to the risk, location, project life, and level of uncertainty.
  • Remains useful across plausible future conditions and can be adjusted as new information becomes available.
  • Avoids shifting risk to other communities, locations, sectors, or future generations.
  • Considers affordability, inclusion, ecosystems, emissions, operations, maintenance, and lifecycle costs.
  • Has a responsible owner, realistic schedule, required approvals, and resources.

Scoring and Interpretation

Calculate the process-readiness average by adding the scores for Questions 1–17 and dividing by the number of questions scored. Exclude N/A items from both calculations.

This average is not a climate-risk rating and is not a pass/fail result. Review individual answers and the risk register. A high process average cannot cancel a single critical risk.

Escalation — When to Seek a Detailed Assessment

Consider a detailed, location- and sector-specific climate risk and vulnerability assessment, with qualified technical input, when one or more of the following apply:

  • Screening identifies high, very high, or unknown risk to life, health, critical services, major assets, or intended outcomes.
  • The project is long-lived, difficult to relocate, costly to retrofit, or has irreversible consequences.
  • Climate information is insufficient to make a material siting, design, investment, or service decision.
  • Multiple hazards, cascading failures, vulnerable groups, or cross-boundary impacts may interact.
  • Adaptation measures could create significant environmental or social effects, transfer risk, or cause maladaptation.
  • The project involves safety-critical infrastructure or sector-specific engineering decisions requiring technical standards.
Screening decision

Review and Sign-Off

RoleNameSignature / confirmationDate
Assessment lead
Technical / climate reviewer (if applicable)
Project owner / decision-maker

Remark

This checklist is an original, practical screening aid informed by the IPCC risk framing of climate hazards, exposure, vulnerability, and impacts, and by the World Bank’s early-stage climate and disaster risk screening approach. Users should apply applicable national requirements, sector standards, organizational risk criteria, and locally appropriate climate information.

Readiness Self-Assessment Summary Results

–out of 4

Score the questions above to see your readiness level.

0 of 17 questions scored. N/A answers are left out of the average.

AverageProcess-readiness interpretation
1.00–1.74Early / Not Yet Assessed — Establish project scope, gather basic climate and asset information, identify hazards and dependencies, and determine whether specialist screening is needed.
1.75–2.49Initial — Close evidence and analysis gaps; clarify exposure, vulnerabilities, consequences, and responsibilities before key project decisions.
2.50–3.24Partly Integrated — Strengthen option appraisal, inclusion, safeguards, design integration, ownership, resources, and monitoring.
3.25–4.00Systematically Integrated — Maintain implementation, monitor performance and residual risk, and update the screening when project or climate information changes.

About The Readiness Checklist

This checklist provides a self-reported snapshot of your current readiness. It is not a verified diagnosis, engineering opinion, investment recommendation, or substitute for specialist advice. It gives a directional summary of potential exposure and preparedness gaps, not a site-specific engineering or financial-impact assessment. A comprehensive assessment requires validating the underlying data, conducting analysis, confirming priorities, and developing a tailored readiness roadmap.

Recommended Next Steps for an In-Depth Climate Risk and Adaptation Assessment

Epsilon Innovation Group shall use the screening results to scope a proportionate Climate Risk and Adaptation Assessment that defines adaptation measures and incorporates responsibilities and monitoring into project planning and implementation.

Contact us to discuss the scope, timeline, and cost.

Discuss Your Results With Us

Optional: send your completed checklist to Epsilon Innovation Group to discuss the next steps.

Your answers and contact details will be sent to Epsilon Innovation Group and used only to follow up on this checklist. See our Privacy Policy.

Score at least one question before sending.

Download Your Checklist

Save the completed checklist, with your results and all your answers, as a PDF.